Full Bathroom Remodeling in Spruce Grove

A full remodel takes the room back to studs so the parts nobody sees get done right. Waterproofing, venting, and framing come first, then the tile and fixtures you actually picked it for.

Overview

What does full bathroom remodel involve in Alberta?

A full bathroom remodel means the room comes back to studs. That sounds dramatic and it is the point: once the walls are open, everything that failed last time becomes visible and fixable. Haylo takes on full remodels throughout Spruce Grove, Stony Plain, Parkland County, and the greater Edmonton area, for homes that have outgrown their original bathroom and for ones where the last renovation is showing its shortcuts.

Demolition is done deliberately rather than fast. What is underneath decides the rest of the project, and pulling a tub surround too aggressively can turn a repairable subfloor into a replacement. As it comes apart we look for the usual suspects: rot around the toilet flange, soft floor near the tub, an exhaust fan venting into the attic, and waterproofing that either was not installed or was lapped the wrong way. In homes built before the mid-2000s, at least one of those is present more often than not.

With the room open, the framing gets corrected. That means blocking for a grab bar if you want one later, proper backing for a wall-hung vanity, and squaring anything that has moved. Plumbing and electrical rough-ins are coordinated at this stage, whether you are keeping the existing layout or moving fixtures. Moving a toilet is more involved than moving a sink, because the drain needs slope and the stack is where it is, and that constraint is worth understanding before the layout is locked.

Waterproofing is the part that separates a remodel that lasts from one that gets torn out in eight years. We install a membrane system behind the tile and in the shower pan, with the seams lapped so water is directed out rather than in, and the pan pitched properly to the drain. It gets checked before tile goes on. This is invisible work that nobody photographs, and it is the single biggest reason bathrooms fail.

Ventilation gets sized for the room and ducted to the exterior, not into a soffit or an attic. Alberta winters make this more important, not less: a poorly vented bathroom in a cold climate pushes moisture into places that will not dry out until spring.

Then the finishes. Tile on the floor and in the shower, the vanity and countertop, fixtures, lighting, mirror, paint, and trim. If you have chosen everything already, we work to your selections. If you have not, Scott will bring options and talk through what holds up in a family bathroom versus a guest ensuite, because the honest answer is different for each.

Most full remodels run three to five weeks on site depending on scope and fixture lead times. You get a schedule with the quote that says which days the room is unusable, and if your home has only one bathroom we plan around that rather than leaving you to figure it out.

If your bathroom needs more than a coat of paint, get in touch for a free site visit. We will tell you what the room actually needs, including the parts you cannot see.

Back to all Bathroom Renovations
What is included
  • Demolition and safe disposal
  • Plumbing and electrical rough-in coordination
  • Waterproofing membrane behind tile and in the shower pan
  • Tile, vanity, fixtures, and lighting
  • Proper exhaust venting to the exterior
  • Paint and finishing trim
Questions

Full Bathroom Remodel questions

A straightforward main bathroom is usually two to three weeks on site. A full remodel back to studs, or anything that moves plumbing, runs three to five weeks. Scott gives you a schedule with the quote and tells you which days the room is unusable.

Cosmetic work like tile, a vanity swap, or paint does not need one. Moving plumbing, altering framing, or adding a bathroom where there was none does. Haylo pulls the permits and books the inspections as part of the job.

Usually yes. It depends on whether the slab has a rough-in already. If it does, the job is straightforward. If it does not, it means cutting concrete and tying into the main stack, which is more work but very common in older Tri-Region homes.

Yes, and it is one of the most requested changes we do. It involves re-working the drain, waterproofing the new pan properly, and often reframing the opening. Done right it is watertight for decades.

More bathroom renovations services

You may also need

Visit or call

Haylo Contracting Ltd

  • Spruce Grove, AB
  • (780) 221-5815
  • Monday to Friday, 7:30 AM to 5:00 PM. Closed weekends.
Free Quote

Ready to build with Haylo?

Tell us about your project and we will book a free site visit and prepare a clear, itemized quote. No obligation.